150w Street Light Housing Supplier introduces the order of lighting installation
1. The installation sequence of ordinary lamps and lanterns
Installation of plastic (wood) table. Pass the light connection wire out of the outlet hole of the plastic (wood) table, put the plastic (wood) table close to the surface of the building, align the mounting hole of the plastic (wood) table with the screw hole of the lamp holder, and use the machine screw to fix the plastic The (wood) table is firmly fixed.
2. Installation sequence of wall lamp
First select the appropriate wooden table or lamp base according to the shape of the lamp and place the lamp on it, leaving a symmetrical margin around it, and then use an electric drill to make the outlet holes and installation holes on the wooden board, and also on the bottom plate of the lamp. Open the installation hole, throw the lamp cap wire out of the outlet hole of the wooden table, connect the lamp cap box on the wall, and wrap it tightly, and stuff the connector into the box. >>More
3. Installation sequence of the lantern
Installation of combined ceiling lanterns: According to the positions of the embedded bolts and the lamp holder box, use an electric drill to open the mounting holes and outlet holes on the pallet of the luminaire, hold the pallet up during installation, and throw the power cord away from the luminaire. The wires that come out are connected and wrapped tightly. The wires should be inserted into the lamp holder box as much as possible, and then the mounting holes of the support plate should be aligned with the embedded bolts, so that the periphery of the support plate and the ceiling should be close, tighten it with a nut, adjust each lamp port, and hang the lamp. All kinds of decorations, and good lamps and bulbs.
Through the above introduction,Die-Cast Housing Manufacturers hopes that you can simply refer to the content of this article in future use.
1. The installation sequence of ordinary lamps and lanterns
Installation of plastic (wood) table. Pass the light connection wire out of the outlet hole of the plastic (wood) table, put the plastic (wood) table close to the surface of the building, align the mounting hole of the plastic (wood) table with the screw hole of the lamp holder, and use the machine screw to fix the plastic The (wood) table is firmly fixed.
2. Installation sequence of wall lamp
First select the appropriate wooden table or lamp base according to the shape of the lamp and place the lamp on it, leaving a symmetrical margin around it, and then use an electric drill to make the outlet holes and installation holes on the wooden board, and also on the bottom plate of the lamp. Open the installation hole, throw the lamp cap wire out of the outlet hole of the wooden table, connect the lamp cap box on the wall, and wrap it tightly, and stuff the connector into the box. >>More
3. Installation sequence of the lantern
Installation of combined ceiling lanterns: According to the positions of the embedded bolts and the lamp holder box, use an electric drill to open the mounting holes and outlet holes on the pallet of the luminaire, hold the pallet up during installation, and throw the power cord away from the luminaire. The wires that come out are connected and wrapped tightly. The wires should be inserted into the lamp holder box as much as possible, and then the mounting holes of the support plate should be aligned with the embedded bolts, so that the periphery of the support plate and the ceiling should be close, tighten it with a nut, adjust each lamp port, and hang the lamp. All kinds of decorations, and good lamps and bulbs.
Through the above introduction,Die-Cast Housing Manufacturers hopes that you can simply refer to the content of this article in future use.
コメント